Tuesday, 1 November 2016

Day Two: Filming on the roof.


Today we went to our second location which was the jealous gallery rooftop.

We arranged to arrive at the rooftop at 11am and asked Jem to arrive at 12, giving us enough time to set up and go over what shots we need to get done, this is where our shot list came in handy.

Once Jem had arrived we started filming.

The shots we needed were:

  • Lip syncing shots in front of the painted wall
  • Lip syncing while performing/walking around the roof
  • Playing guitar on the edge of the roof
Those were the basic shots that we needed, we also intended to shoot some pick ups and whatever we thought would look good at the time.

The filming went very well, Jem gave a good performance despite needing some encouragement to perform with a bit more enthusiasm at times.

One really good aspect of today is that we got a really nice sunset which we were not expecting, this meant that we got some extra shots for the video, also the 'Jealous' sign lit up really nicely as it got darker which meant we got some really nice shots of Jem in front of it.

Overall, today was far some successful than Brighton, we felt much more organised and under less time pressure.


No comments:

Post a Comment